Report an outage:
(863) 946-6200
Via SmartHub
Font Size: plus minus
The co-op employee or contractor will leave a door hanger on your front door to let you know they have [...]
The meters will be able to record outages allowing the cooperative to verify whether the outage is either on the [...]
Yes, meters can have remote disconnect capabilities. [...]
The meter display is visible for members to be able to check their consumption. All other information and data stored [...]
Routine inspections of all meters and services will continue in order to look for safety hazards, theft or other problems. [...]
The cooperative’s computer will communicate with the meter via the power lines. A request is sent to the meter and, [...]
No. Reasonable access to equipment still must be maintained. This allows for cooperative personnel to either read or maintain the [...]
All of the co-op’s new meters can be read at a variety of times to obtain a history of account [...]
The new meter records an electronic kWh reading, the date and time of energy usage. With the new AMI meters, [...]
Probably not. Meter specialists will no longer regularly need to spend valuable time traveling to every meter for a monthly [...]
Contact your nearest co-op office right away to discuss your billing concerns. Electronic meters are more accurate than analog or [...]
Yes, members will continue to stay on the same rate class as they have in the past. There will be [...]
The new meters are digital electronic devices while the old meters were an electro-mechanical device or a radio read AMR [...]
No. New meters will be installed on all accounts. The cooperative is embarking on a system-wide program that will change [...]
Glades Electric employees [...]
There will be no additional costs to the member to install the new system. There is no rate increase anticipated [...]
The meter upgrade provides GEC members with numerous benefits. The new meters will help us Save money by eliminating the [...]
With this new meter GEC can read the meter remotely from our central office. Information from the meter is transmitted [...]
Yes, for a few minutes. You will need to reset electronic clocks and other devices. [...]
Meter will be installed beginning at the first of 2014. This could be a 2-year process. [...]